Most change-order trouble starts with a friendly "while you're here" and ends with an invoice the customer did not expect. A simple written process protects both your margin and the relationship.
By Jonathan Champion, founder of ChampEntra ยท Updated October 12, 2026
A change order is a written agreement to change the scope, price or schedule of a job you already agreed to. It sounds like paperwork. In practice, it is how you get paid for extra work without souring the customer.
Here is how it usually goes wrong. The homeowner asks the crew to move an outlet or add a gate. The crew wants to be helpful, so they just do it, and the office never hears about it. Either the company eats the cost, or the extra shows up on the final bill and the customer feels ambushed.
Nobody in that story was dishonest; a process was missing. The fix is a habit everyone understands: changes get written, priced and approved before the work happens. Put it in your contract and explain it at the start of the job, and it rarely feels like a surprise later.
Anything added, moved, upgraded or swapped after the contract was signed, from a bigger patio to a different faucet.
Rot behind the siding, rock in the trench, an unmarked line or existing wiring that will not pass inspection. Photograph it before anything else happens.
New drawings from an architect or engineer, or a selection that changed after you priced the job.
Work an inspector requires that was not in your scope. Whether it counts as a change depends on what your contract says about code compliance.
Late customer-supplied materials, a site that is not ready or another trade that has not finished. These can change your costs and your schedule.
When the customer drops part of the job, write it up as a credit. A clean record runs in both directions.
The steps are simple. The discipline is following them every time, including on small changes.
Steps one and two are where the field crew protects the company. Our guides to field photos that protect your business and how foremen should document daily work cover what to capture.
Some situations will not wait for paperwork: a burst pipe, an unsafe wall, an open trench with rain coming. Make the site safe, document everything and get written approval as soon as you can, even if it only sets a time-and-materials basis or a not-to-exceed amount. Follow your contract's terms for emergency work.
Use the same one-page format every time. Customers get used to it, and nobody has to guess what was agreed.
Most of these come from good intentions: wanting to keep the job moving and the customer happy.
Two people can leave the same conversation with different ideas about the price. Get a signature on a document that names the work and the price.
It is fine to do a small extra at no charge. Write it up as a no-charge change anyway, so the customer sees it was extra and your records show what was really built.
A stack of surprises at the end of a job is a reliable way to start a payment dispute. Bill approved changes as you go, the way each change order says.
The office approves a change, but the crew never hears about it. Or the crew does the work, and the office never bills it. Someone has to confirm both sides every time.
A change order that lives in someone's inbox is hard to find when it is time to bill. Keep a simple log for each job.
Review it before every invoice. Over time, it also shows which kinds of jobs tend to change, so you can tighten scope language on future bids.
If you use ChampEntra, a change can be written up as its own proposal with line items and terms, then sent through a secure signing link with status tracking, so the office can see whether the customer has signed. Field photos and notes stay in the daily job report, budgets and costs are tracked in projects and job costing, and customers can review proposals and invoices in their portal.
It is the safest habit, and small changes are where money quietly slips away. Requirements vary by state and type of work, so ask your attorney to review the change clause in your contract.
Many contractors accept written approval by email or electronic signature. Whether that is enough depends on your contract and your state's rules. At a minimum, the approval should name the specific change and the price.
Hold off on the extra work until it is settled, and explain the price and options in plain terms. If a hidden condition is blocking progress, document it, follow your contract's process and talk with your attorney if it stalls.
When the change order says it will be, often with the next progress invoice or as a deposit before special-order material is bought. Show it as its own line with the change order number so the customer can match it.